Apartment development in Villa Devoto, Buenos Aires. The building has 7 floors: ground floor for parking with 6 parking modules and space for bicycles, floors 1 to 6 with units including five studios, six two-room units and six three-room units, and a communal room on the 7th floor. All units include built-in full kitchens, a balcony and a separate laundry area; aluminium joinery with double-glazed windows, dual boiler for hot water and heating, and FV ceramic-closing taps, with Roca Mónaco fixt